Quick answer
For a commercial wallcovering project, send the plans or elevations, the specified material and its data sheet, quantities, the substrate condition, site access rules and the schedule window. With those, the scope, phasing and timing can be reviewed and a written estimate prepared.
Key points
- The specification decides material, adhesive and primer.
- Substrate readiness is checked before hanging.
- Occupied spaces need phasing and daily clean-up.
- Attic stock should be agreed in advance.
Documents to send
- Floor plans and elevations showing which walls get wallcovering.
- Finish schedule and the product specification (manufacturer, pattern, width, type).
- Product data sheet with adhesive and primer requirements.
- Quantities ordered or planned, including attic stock.
- Photos of the current walls.
Material basics
Commercial projects often specify vinyl wallcovering classified by weight and durability (commonly Type I for lighter-traffic areas and Type II for corridors and high-traffic spaces), as well as textiles, acoustic panels or digitally printed murals. Wide goods are frequently 54 inches and are usually double-cut at the seams. The manufacturer's instructions on adhesive and primer should be followed.
Substrate readiness
| Check | Why |
|---|---|
| Drywall finish level | Thin or dark goods show joints and texture |
| Primer applied | Adhesion and future removal |
| Moisture | Damp substrates can lead to failures |
| Existing wallcovering | Usually removed before new goods |
| Corner guards, trim, devices | Sequence of trades around the wallcovering |
See wall preparation and wallpaper removal.
Site and access
- Working hours and noise limits.
- Loading dock, parking and elevator access.
- Storage for material on site.
- Rules for occupied areas: signage, protection, daily clean-up.
- Site contact person.
Scheduling and phasing
In hotels, offices and retail, work is often phased by room block, floor or zone so the business can keep operating. Share your preferred windows; scheduling is reviewed as part of the scope.
Handover
- Walkthrough and punch list with the manager or GC.
- Labeled attic stock with run numbers.
- Care notes for the maintenance team.
Start with commercial wallpaper and wallcovering installation or send documents through the contact page.
FAQ
What is attic stock?
Extra material from the same run kept on site for future repairs. The amount is usually set in the specification.
Can you work from drawings before the site is ready?
Drawings and specs allow an early review of quantities and scope; a site check confirms substrate readiness before installation.
Do you install digitally printed murals in commercial spaces?
Yes. Send the file size, panel layout and wall measurements so the installation can be planned.